Statom Group were contracting by Weston Homes to complete Block B and Block C on the Town Quays Development. Both Blocks were 7-story RC Frames with Sloping RC Walls from 45*-60* degree inclines starting on Level 04 and terminating at Roof. The Development consisted of 147-dwellings and 4-commercial units.
Location:
Barking, East London IG11
Scope of Works
- Piling Attendance
- Groundworks, with associated shallow/deep drainage and services
- In-Situ Concrete Elements, (Columns and Slabs)
- Pre-Cast Concrete Elements, (Stairs and Columns)
- Uni-Panel/Uni-Wall Installation
- Jumpform Cores
- Sloping RC Walls and Valley Walls