Statom Group Projects

Ardersier Port Development

Scotland, IV2

Statom Group North Itd, has been awarded the civil engineering works package by Haventus Limited for the Ardersier Port Development.

Tilbury

Port of Tilbury

Thameside ERF is the latest EfW facility in the Viridor fleet. The site is located in the Port of Tilbury, on the north-west side of the Docks.

Bristol Airport Car Park

Bristol, BS48

Statom Group are pleased to begin works on a new four-level multi-storey car park at Bristol Airport for our valued stakeholder, Farrans. The facility will provide over 2,000 spaces, state-of-the-art technology, and dedicated Blue Badge parking.

Milton Keynes

Milton Keynes, LU7

The Milton Keynes East Infrastructure scheme is a strategic highways works package which will enable the delivery of 7500 new homes, 4 Million sq ft of land for employment use, schools, community centre & other land use.

Broadway East Marian Place

Bethnal Green, E2

Statom Group are pleased to be working on the former Marian Place Gasholder site in Bethnal Green for our valued stakeholder St Williams LLP, part of the Berkeley Group.

Oval Village

London, SE11

Statom is honoured to contribute to the regeneration of the iconic Oval Gas Works site. Supporting Berkeley Homes in delivering over 800 homes and vibrant mixed-use spaces, we’re helping bring new life to this historic London landmark.

White City

London, W12

We are excited to announce our successful acquisition of the prestigious White City Living project in West London. This landmark development features five contemporary buildings, ranging from 22 to 30 storeys, set amidst eight acres of parks and gardens.

Leven Road

London, E14

Set in the heart of Poplar, East London, Rivermark is a vibrant new development located on the banks of the River Lea.

Bracknell Beeches

Bracknell, Berkshire

Statom Group is proud to have been awarded the Groundworks and RC Frame package for the prestigious Bracknell Beeches development in Bracknell.

Wandsworth Mills

South West London, SW18

As part of the works at Wandsworth Mills for St James, STATOM Group took key steps to protect and strengthen the historic river wall, ensuring its stability due to the site’s industrial past and environmental conditions.

Legacy Wharf

Stratford, E16

Statom Group has started work on Legacy Wharf in Stratford for our valued stakeholder Bellway Homes.

Drove Lane, Yapton

West Sussex

The Yapton Project consists of 300 units across 3 phases. A sizable and ambitious development that has to consider the unique nature of the location. Our role is the delivery of much of the key infrastructure and enabling works.

Barking Riverside

East London, IG11

The project at Barking Riverside consists of two block Apartments of six storeys with a podium slab and high-end external finishes. 

Leven Road Riverwall

London, E14

The Leven Road River Wall Reconstruction in Poplar, London, is a vital infrastructure upgrade aimed at reinforcing the structural integrity of the river wall along Leven Road. This project is essential to ensuring the long-term durability and functionality of the riverfront, protecting against erosion and future environmental challenges.

Wandsworth Mills Riverwall

South West London, SW18

As part of the remediation and enabling works for Weston Homes at Wandsworth Mills, STATOM Group implemented critical measures to protect and reinforce the historic river wall. Given the site’s long industrial history and environmental challenges, safeguarding the structural integrity of the river wall was a key aspect of the project.

Twelve Trees Park

West Ham, E15

TwelveTrees Park in East London, offers over 3,800 new homes between Stratford and Canary Wharf. Residents enjoy quick access to multiple transport lines via West Ham station.

Kings Park Road

Fulham, SW6

Statom Remediation has been appointed as the delivery contractor for the remediation package at Kings Park Road, working on behalf of St William.

London Dock

Tower Hamlets, E1W

Statom Remediation has been appointed as the delivery contractor for the enabling works package at London Docks, working on behalf of St George.

Acton 8.1

London, W3

STATOM is progressing with demolition at Acton Gardens Phase 8.1 — removing two 6-storey blocks and recycling the arisings to prepare pile mats for the next phase.

Acton Gardens

London, W3

We’re undertaking demolition works at Acton Gardens, including Jerome Tower , a 16-storey block to be demolished top-down along with Osborne House and Doyle House.

Cambridge Rd Estate

Kingston upon Thames, KT1 3HW

Demoforce have been awarded the demolition of three former residential blocks at the Cambridge Rd Estate. Works comprise of the asbestos removal, soft strip works, and complete Demolition and removal of all the slabs and foundations.

Victoria Quarter

London, EN4

Demoforce were given the task to demolish the 1960s pedestrian bridge at the Victoria Quarter redevelopment in Barnet. 

Station Road

Cambridge, CB1

An office block of over 14,000 sq m in Station Road, Cambridge which is already a popular location for businesses.

Abbey Quay

Barking, IG11

Statom Group were awarded the remediation and enabling works contract by Weston Homes.

Oval Block B, D & E

London, SE11

The Oval Gas Works in London is a remarkable example of how innovation and ingenuity can transform a city.

Harrow View

Harrow, HA2

The Kodak factory in Harrow has stood since 1891 and, as well as providing employment for thousands of people over its life, was well known as a part of the skyline with a 213ft tall, white chimney.

Lyon Close

Hove, BN3

Our Hove Project consists of 4 buildings, between 4 and 8 stories, a total of 152nr dwellings and office accommodation.

Bow Common Lane

London, E3

Statom Group Ltd are pleased to announce the start of their first project for St William, Berkeley Group Plc. Bow Common Gasworks is a 3.86 hectare site formerly used for the production and storage of gas.

Clapham Park

South West London, SW4

The Clapham Park Regeneration Project, in collaboration with Countryside Partnerships and Vistry Partnerships, marks a significant undertaking in the transformation of the area.

Clapham Park Phase C02

South West London, SW4

Demoforce have been awarded the demolition contract for 3no buildings for this phase of the regeneration of Clapham Park for Countryside Partnerships.

Leegate Shopping Centre

London SE12 8SS

Demolition works are progressing well at London Square’s 17,500 square metre Leegate Shopping Centre site, with Statom Group Demolition advancing the project safely and on schedule.

Little Mount Lake

Frant, East Sussex

Statom Group has been appointed by Thakeham Homes to deliver a major groundworks, reinforced concrete, and infrastructure package at the Little Mount Lake development in Frant.

Haymarket

Edinburgh

Statom North is proud to announce the award of the concrete frame build package by leading design-and-build contractor McAleer & Rushe for the Haymarket Hotel development, located in the heart of Edinburgh.

Abbey Road - Phase 2

South East London

Phase 2 has now reached the final two floors of the 30-storey tower, with completion scheduled for early February next year. This marks a major step forward in the delivery of the superstructure works.

Abbey Road - Phase 3

South East London

This phase marks Statom Group’s third involvement on the overall development, having previously delivered reinforced concrete frame works on earlier phases of the scheme.

Hertford Locks

Hertford East, Hertfordshire

Statom Group is delivering the civil engineering and groundworks package for the Hertford Locks residential development, a £4 million scheme located in the centre of Hertford, just a three-minute walk from Hertford East railway station.

Stansted Airport

Stanstead

The project shows Statom’s ability to work in a challenging logistical environment coinciding with Stanstead everyday airside operations.

We Are Available